Millennium Silver hires Robison Engineering for Silver Peak water capture system design, installation
Reuters2026/08/05 23:10- Millennium Silver engaged Robison Engineering to design and oversee installation of a water capture system at the Nivloc area of its Silver Peak silver-gold project in Nevada.
- The system is intended to supply water under the company’s existing water rights to support its planned 2026 resource expansion drilling program.
- Major deliverables are expected about six to eight weeks from the start of work, subject to site conditions and contractor availability.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
Japanese Yen consolidates near August highs vs USD as hawkish BoJ, Fed bets clash
The 10-year U.S. Treasury yield climbs to 4.8%, erasing the dividend advantage of utility stocks; the sector’s rebound depends on interest rate stabilization rather than technical signals.
As U.S. Treasury yields continue to climb, the American utilities sector is experiencing a significant pullback—a rise in yields not only erodes the relative appeal of the sector’s dividends but also raises financing costs for the most capital-intensive industries within this market.

Euro holds gains above 1.1600 despite robust US jobs data, traders eye ECB rate decision